Supply Date31 Oct 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity16.1
Freight0
Loading Charges-7
Offloading Charges1.81
Royalty5.78
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1233.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.4
Fe3.25
SiO211.9
Al2O33.89
P0.161
Size 0-10MM2.8
Size 10-20MM3.9
Size 20-100MM77.5
Size +100MM15.8
MOISTURE3.9