Supply Date29 Oct 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity37.8
Freight32.01
Loading Charges0.9586
Offloading Charges-3.096296296
Royalty6.25
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5372.22
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn44.1
Fe10.1
SiO210.65
Al2O33.78
P0.12
Size 0-10MM2.8
Size 10-20MM5.6
Size 20-100MM80.11
Size +100MM19.89
MOISTURE0.98