Supply Date20 Oct 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity39.42
Freight32.01
Loading Charges-5
Offloading Charges-0.303906646
Royalty7.13
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost5512.34
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn47.1
Fe3.5
SiO211.11
Al2O33.58
P0.12
Size 0-10MM0.59
Size 10-20MM2.98
Size 20-100MM2.1
Size +100MM80.22
MOISTURE14.7