Supply Date08 Oct 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity16.56
Freight0
Loading Charges0.91
Offloading Charges0
Royalty5.5
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1364.71
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.65
Fe2.6
SiO210.25
Al2O34.55
P0.149
Size 0-10MM6.58
Size 10-20MM11.45
Size 20-100MM79.92
Size +100MM2.05
MOISTURE3.68