Supply Date06 Oct 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity41.76
Freight71.84
Loading Charges0.88
Offloading Charges-0.003831418
Royalty5.5
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost6440.07
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.64
Fe3.55
SiO211.47
Al2O34.75
P0.152
Size 0-10MM11.24
Size 10-20MM13.10
Size 20-100MM75.66
Size +100MM0
MOISTURE7.95