Supply Date01 Oct 2022
Contract NumberSAFAL/P/MN ORE/08.02/2022
ItemManganese Ore
Supplier NameAMIZO POWER ENGINEERS LTD
Grade (%)High (44% - 50%)
Lot NumberAMIZO POWER ENGINEERS LTD-HG
Deviance0
Inward Quantity43.84
Freight28.81
Loading Charges0
Offloading Charges3.787864964
Royalty7.29
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost7272.52
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn46.90
Fe3.10
SiO211.50
Al2O33.92
P0.121
Size 0-10MM0.50
Size 10-20MM1.10
Size 20-100MM2.81
Size +100MM95.59
MOISTURE0.52