Supply Date30 Sep 2022
Contract NumberSAFAL/P/MN ORE/01.01/2022
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity35.2
Freight26.15
Loading Charges0
Offloading Charges0
Royalty4.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4815.36
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusRejected

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.10
Fe2.10
SiO212.90
Al2O34.60
P0.120
Size 0-10MM2.61
Size 10-20MM3.50
Size 20-100MM79.99
Size +100MM20.90
MOISTURE1.10