Supply Date27 Sep 2022
Contract NumberSAFAL/P/MN ORE/09.03/2022
ItemManganese Ore
Supplier NameDING CHENG INVESTMENT LTD
Grade (%)Medium (38% - 44%)
Lot NumberDING CHENG INVESTMENTS LTD -MN ORE
Deviance0
Inward Quantity29.76
Freight0
Loading Charges34.41465054
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost3285.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn4205
Fe4.35
SiO210.95
Al2O33.90
P0.152
Size 0-10MM7.20
Size 10-20MM7.55
Size 20-100MM84.01
Size +100MM1.24
MOISTURE7.35